Construction Scheduler- Data Center Delivery

Call Center RepresentativeCall Center RepresentativeFull TimeRemoteTeam 201-500

Location

United States

Posted

9 days ago

Salary

$111K - $145K / year

No structured requirement data.

Job Description

About Us

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.

Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About this Role

Remote with 40% domestic travel to project site. 

 

QISG is seeking mid-level and senior-level Schedulers (Primavera P6) to partner with Project Managers, Engineers, and field teams in building and maintaining resource-loaded P6 schedules across EPC, Design-Build, and CMAR delivery models.

 

This role supports projects from planning through construction, commissioning, and closeout, with a strong emphasis on critical path management, schedule risk mitigation, performance and forecast tracking. 

 

The ideal candidate will bring Primavera P6 scheduling experience in data centers or commercial infrastructure and can confidently translate complex engineering and field inputs into clear, executable, and well-structured project schedules.

 

What You'll Do

  • Develop and maintain CPM schedules.

  • Build and update resource- and cost-loaded Primavera P6 schedules.

  • Integrate inputs from engineering, procurement, construction, and commissioning (intra-company or subcontractor) teams.

  • Link WBS to CBS for accurate forecasting, cash flow, and financial alignment.

  • Produce earned value metrics, schedule KPIs, and cash flow reports for project controls and executive reporting.

  • Conduct critical path analysis, what-if scenarios, productivity tracking, and time-impact assessments.

  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies.

  • Support look-ahead planning, short-interval schedules, and continuous improvement.

  • Maintain compliant schedule documentation per contract and company standards

What You'll Bring

  • 4-10 years of scheduling experience in Engineering/Procurement/Construction (EPC) industry. 

  • Data center or commercial infrastructure P6 scheduling experience.
  • Primavera P6 expertise, including cost- and resource-loaded schedule development.
  • Experience with large-scale sitework, and long-lead equipment schedules for data center or commercial projects.

  • Familiarity with Deltek Acumen Fuse/Risk, or similar schedule analysis tools.

  • Ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams.

  • Strong communication and influencing skills, coordinating across multiple departments.

  • Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments.

  • High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred.

What You'll Get

  • Competitive base salary

  • Generous PTO & paid holidays to maintain work-life balance

  • 401(k) with a generous match to plan for your future

  • Comprehensive benefits – medical, dental, vision, and life insurance

  • Weekly pay for consistent, reliable compensation

  • Great mentoring & career growth opportunities – we invest in your development#LI-SM1 

Compensation Range

The anticipated compensation for this position is USD $111,000.00/Yr. - USD $145,000.00/Yr. depending on experience and qualifications.

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.We are an Equal Opportunity Employer, including disability and protected veteran status. We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Related Categories

Related Job Pages

More Call Center Representative Jobs

Call Center Representative9 days ago
Full TimeRemoteTeam 51-200

This role involves answering inbound crisis and social service referral contacts via phone, text, chat, and email, providing crisis de-escalation, assessment, and appropriate referrals in a 24/7 call center setting. Responsibilities include consistently assessing for suicide risk, providing safety planning, acting as a mandated reporter, and accurately recording all client and resource information in the database.

United States
$13 - $14 / hour
Call Center Representative9 days ago
Full TimeRemoteTeam 1

The specialist will manage client bookings, schedules, and confirmations while maintaining communication to gather details and provide necessary updates. This role ensures accuracy and timely follow-ups, delivering professional and friendly support throughout the entire process.

United States

Patient Access Specialist

Medical University of South Carolina

The Medical University of South Carolina is an Equal Opportunity Employer. MUSC does not discriminate on the basis of race, color, religion or belief, age, sex, national origin, gender identity, sexual orientation, disability, protected veteran status, family or parental status, or any other status protected by state laws and/or federal regulations. All qualified applicants are encouraged to apply and will receive consideration for employment based upon applicable qualifications, merit and business need. Medical University of South Carolina participates in the federal E-Verify program to confirm the identity and employment authorization of all newly hired employees.

Call Center Representative9 days ago
Full TimeRemoteTeam 10,001

The role involves providing administrative coverage at the front desk, which includes monitoring the clinic appointment line for scheduling clients from various external systems. Responsibilities also include answering multiline telephones, processing payments for clinical services, completing client registration and documentation, scheduling interpreters, and retrieving billing charges.

United States

Member Experience Representative

First Entertainment Credit Union

Named one of the top 10 Credit Union in California by Forbes, First Entertainment Credit Union has been the financial ally since 1967 for the creators of entertainment and those who support them. With more than 2.1 billion in assets and over 90,000 members, we are constantly looking for talents to help us build a high trust, high performance and workplace of choice culture while growing our business. As a teammate, you will enjoy an inclusive workplace culture and an employer-of-choice environment. At First Entertainment Credit Union we believe Your Story Matters and that includes our members, employees, community, and those interested in joining our growing team.

Call Center Representative9 days ago
Full TimeRemoteTeam 225Since 1967

The Member Experience Representative provides exceptional service through various channels, builds relationships, assists with inquiries, and promotes credit union products.

BillpayMS OfficeOnline BankingSymitar For WindowsZelle
Ohio + 9 moreAll locations: Ohio, Texas, Idaho, Nevada, Florida, Georgia, Colorado, California, New Mexico, District of Columbia
$25 - $32 / hour